WE, are independent and not related in any way to any Companies and Organizations; and,
-------------------------------------------------------------------------------------
WE, are greatly motivated by the spirit of "sharing knowledge and information" to others.
Nov
14th

SAP Tables in Production Planning Module - Part 6

Author: admin | Files under PP Tables

Listed below are SAP standard tables in Production Planning Module - Part 6:

TPKPT–>Kanban authorization text
TPKSF–>Kanban Status Sequences
TPKTX–>Kanban container status short text
TCPFS1–>Planning area for external planning tool
TCPFS2–>Planning tool, physical system
TCPFS3–>External planning tool: lock table
TCPFS4–>External planning tool
TCPFS4T–>Planning tool description
TCPFS5–>External planning tool: start parameters for Windows NT
BLPK–>Document log header
BLPP–>Document log item
EMRP_RUN–>Blocking argument for MRP
KDPL–>Index customer order -> planned order
MDFD–>MRP firming date
MDKP–>Header data for MRP document
MDSM–>Simulative dependent requirements
MDTB–>MRP table
MDVL–>Planning file entry for long-term planning
MDVM–>Entry in MRP File
PBED–>Independent requirements data
PBHI–>Independent requirements history
PBIC–>Ind. reqmts index for customer requirements (without RV)
PBIM–>Independent requirements for material
PBIV–>Ind. reqmts index for consump. of exter. non-variable parts
PBVPV–>Material index for consumption of planning
PKTMP–>Conversion table for PKPS / please do not use
PLAF–>Planned order
PLPB–>Long-term planning: independent requirements versions
PLPT–>Long-term planning: plants of planning scenario
PLPW–>Index of the production/delivery plant in the planned order
PLSC–>Planning scenarios in long-term planning
PSPL–>Index project -> planned order
PUMS–>Project number new key assignment (structure)
RDPR–>Rounding profile
RDTX–>Short text describing the rounding profile
REUL–>Material stock transfer reservation index
RQHD–>Header record for requirements total records in MRP
RQIT–>Item record for requirements total records in MRP
RSDB–>Index of the RESB for the Direct Procurement Element
SAFK–>Run schedule master data
SNUC–>Changed revision levels (for creating MRP records RM61SR00)
SNUM–>BOM explosion number
SUMS–>New key assignment: BOM explosion no.->New BOM explosion no.
T024D–>MRP controllers
T399D–>Control parameters for MRP
T399Q–>Default values for maintaining independent requirements
T436A–>Floats for scheduling
T437V–>Distribution key in MRP
T437W–>MRP distribution key (texts)
T438A–>MRP Type
T438M–>Control parameter for MRP -material level-
T438R–>Range of coverage profile
T438S–>Text describing the range of coverage profile
T438T–>MRP description
T438X–>MRP group text
T439A–>MRP lot sizes
T439F–>Handling of planning flag at abnormal termination
T439G–>PPplanning periods: header table
T439H–>PP planning periods: long texts
T439I–>PP planning periods: schedule lines (periods)
T439J–>PP planning periods: calculation rule
T439L–>Warehouse costs for MRP lot size
T439T–>Texts for lot-sizing procedures
T440B–>Control table for creating MRP record
T440C–>Planning file entries for goods movements
T440F–>Exception messages for the forecast
T440Z–>Allocate error -> error class in the forecast
T441G–>Checking group values
T441R–>Values table for checking rule
T441V–>Availability check control
T441W–>Checking rule texts
T442B–>Start times for MRP background programs
T442C–>Control: activity reqmts transfer MRP/SOP -> CO
T449A–>Period split
T449B–>Period split: language-dependent description
T449F–>Control of sequence of the extended header in the MRP list
T449U–>Settings for collective display of MRP list
T450–>MRP transaction control
T450F–>Field selection maintaining independent requirements
T450P–>Transaction control for maintaining ind. requirements
T450U–>User exit material selection - MRP
T457A–>Processing key for planning run
T457C–>Transaction calls control
T457G–>MPS evaluation: evaluation profile
T457H–>MPS evaluation: hierarchy of MRP elements
T457I–>MPS evaluations: long texts
T457J–>MPS evaluation: user-specific layout
T457K–>MPS evaluation: user-specific schedule lines
T457L–>MPS evaluation: receipts/issues texts
T457P–>Text table for order types in the planned order
T457S–>Block table for MRP and forecast run
T457T–>Description of MRP elements
T458A–>Exception messages in material requirements planning
T458B–>Description of exception messages
T459A–>External requirements types
T459C–>Default values for independent requirements
T459K–>Control table for customer requirements
T459R–>Reference requirements table
T459S–>Period splitting
T459U–>Settings for maintaining independent requirements

You may also consider reading these:

One response. Wanna say something?

  1. santosh singh
    Mar 15, 2009 at 10:33:35
    #1

    This software is very useful for every fields.
    We like this software very much.

Post a Comment